Installation Generally

  • Carry out Electrical Work in accordance with the Drawings, Specification and Regulations, ensuring compliance with design and performance requirements to provide safe and protected systems with equipment readily accessible for operation, maintenance and repair.
  • Installations shall be complete, ready for operation and fully integrated and coordinated with all other work.
  • Provide accessories necessary to complete the installations, of the types specified or recommended for the purpose by the manufacturer of the equipment or accessories.

Field tests shall, in addition to those specified by regulation, specifically include the following

  • Insulation resistance tests for all parts of the electrical system, irrespective of voltage class and shall include individual measurement between the various live conductors as also between the individual live conductors and ground.
  • Earthing resistance at each equipment.
  • Loop impedance of each circuit.
  • Earth leakage protection device test.

Existing Utilities:

Do not interrupt utilities serving facilities occupied by Employer or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

  • Notify Engineer at least 2 days in advance of proposed utility interruptions.
  • Do not proceed with utility interruptions without Engineer’s writte permission.